Client: EDP COMERCIALIZADORA, S.A.U.
Location: Spain
We are the current awardee of a contract with EDP Comercializadora for the installation of public charging points for electric vehicles from 7.5 kW to 50 kW throughout Spain.
The installation service of the charging points includes the following scope:
- Agreement on the exact connection point with the Electricity Distribution Company, including the necessary field visits to clarify any interference.
- Obtaining the necessary building permit and others, including the preparation of all the necessary documentation (project, technical report, etc.).
- Required civil works for the installation (channelling, foundations for the protection cabinet, foundations for the recharging equipment, "canopy" for protection against rain at the recharging point, replacement of paving, etc.).
- Laying and supply of the service connection to provide service to the installation. According to the power requested: 7.5 kW, 22kW and 50 KW.
- Supply and installation of all the electrical material, as well as protection elements, in accordance with the Low Voltage Electrotechnical Regulations and ITC-BT-52.
- If applicable, installation of the necessary lighting.
- Connection and correct checking of the "earthing" of the corresponding elements.
- Installation of the recharging station, taking into account the installation manual for each model.
- Legalisation of the installation at the competent Public Administration, including all applicable documentation, as indicated in the regulations.
- Preparation of the installation's operation and maintenance manual.
- Labelling of the parking space where the electric recharging takes place.
- Maintenance of the installation including the recharging equipment. Including the integral execution of maintenance in its three modalities (legal, preventive and corrective), and managing and coordinating all the necessary personnel and material or spare parts resources.
Client: RED ELECTRICA DE ESPAÑA (REE)
Location: Spain
Scope of the work: Protection Testing, Functional Testing and assistance in the commissioning of numerous 220 and 400 kV electrical substations throughout the country.
Client: ENEL UNION FENOSA RENOVABLES
Location: Spain
Design of the protection scheme, adjustment of selectivities, protection tests, functional tests and assistance to the commissioning of the SAN GIL and PEñA II 30/132 kV electrical substations.
Client: EDEMSA
Location: Argentina
Construction and start-up of a 32 km-long 132kV overhead line.
Client: NEO ENERGIA
Location: Spain
8.5 km, single circuit overhead line with LA-280 (HAWK) lead and 8.5 km of OPGW 48 optical fibre cable laying. Hoisting and reinforcement of 32 Drago, Arce and Olmo supports.
Client: COBRA INSTALACIONES Y SERVICIOS, S.A.
Location: Spain
Length of hanging: 21km LA-380 single circuit (GULL) plus OPGW optical fibre cable. Hoisting and reinforcement of Arce supports.
Client: ACCIONA ENERGIA
Location: Mulchén, Región Bio Bío (Chile)
Construction of the 220 kV power line with a length of 33 km in two sections between the substations of the San Gabriel and Tolpan wind farms and the Mulchen substation in Renaico, Chile.
Client: UFD
Location: España (Spain)
The works on UFD's medium and low voltage network in Ferrol consists of the following tasks:
- Assembly and installation of service connections.
- New supplies or extension of existing ones.
- Revision of connection installations.
- Modifications to the network.
- Development work on the medium and low voltage network.
- Adaptation, replacement or reform work and regulation of installations.
- Remote control points.
- Maintenance work on medium and low voltage network installations.
- Local Operation, which covers the following activities:
o Manoeuvring the medium and low voltage network.
o Locating, isolating faults and provisionally restoring service on the medium and low voltage grid.
Responding to warnings of possible faults in customers' private low-voltage installations (known as Single Supplies) and repairing them if the customer accepts the prices and so requests.
Client: EDP RENOVABLES ESPAÑA, S.L.U.
Location: España (Spain)
The works and services carried out in EDP HC Energía's ≥ 50kV substations mainly consist of the following tasks:
- Reforms, renovations and extensions
- Engineering: Preliminary technical-economic studies, documentation for administrative processing, tender documents for works, updating of plans and other services.
- Planned Maintenance (Preventive and Predictive).
- Corrective Maintenance.
- Adaptations of installations derived from regulatory inspections.
- Breakdown service to attend to failures.
Client: L'OFFICE NATIONAL DE L'ELECTRICITE
Location: Marruecos (Morocco)
Turnkey construction of the 225/60 kV OULED REHHOU and 225/30 kV BERRECHID III substations. The first has two 100 MVA transformers and two more transformer positions in another 225 and 60 kV substation; and the second has a 70 MW transformer. Both are owned by L'ONE, the Moroccan national electricity company.
Client: SONNELGAZ
Location: Argelia (Algerie)
Turnkey construction of five distribution substations for the national electricity company Sonnelgaz.
60/30kV, 2x40 MVA AIN FAKROUN substation
60/30kV, 2x40 MVA SOUMAA SUBSTATION
60/30kV, 2x40 MVA GDYEL SUBSTATION
60/30kV, 2x40 MVA AIN EL HOUT SUBSTATION
60/30kV, 2x40 MVA HENNAYA SUBSTATION
Client: HIDROELECTRICA DEL CANTABRICO
Location: Spain
Expansion of the 400 kV compound of the Soto de Ribera (Ferreros) substation, including the engineering, supply, electrical and mechanical assembly and civil works of two 400 kV lanes called Calle 5 and Calle 6, including the supply to and installation of the necessary control, protection and communications housings. This 400 kV compound has an interrupter and a half configuration in a conventional weatherproof plant. In addition, the supply to, assembly of and civil works were carried out for the gateway of two 400 kV transmission lines to carry out the 400kV overhead-to-underground transition.
Client: RED ELECTRICA DE ESPAÑA (REE)
Location: Spain
"Turnkey" construction of the GIS Telledo 220 kV substation in accordance with REE standards, including: engineering, civil works, building construction, electrical and mechanical assembly, exterior switchgear supply and protection housing, auxiliary services, cabling and final testing up to commissioning for REE. The substation includes two bays, two transformer and coupling bays executed as armoured GIS manufactured by Siemens.
Client: RED ELECTRICA DE ESPAÑA (REE)
Location: Spain
Electromechanical installation and commissioning of 400 kV substation Salas (Asturias) for REE. The substation configuration is switch and Environment, with three streets, and the following positions:
Client: E.ON DISTRIBUCION, S.L
Location: Spain
Design of protective outline, adjustment of selectivity, protection testing, functional testing and start-up assistance for the SAN CIBRAO 20/132 kV electrical substation.
Client: CHILQUINTA ENERGIA
Location: Provincia Melipilla. Región Metropolitana (Chile)
The works include changing the configuration of the 220 kV yard to switch and a half, installing a new bank of single-phase 220/110 kV 150 MVA autotransformers with their respective connection panels, at both voltage levels and the extension of the 110 kV busbar including the installation of a disconnector panel on the latter busbar.
Client: ACCIONA ENERGIA
Location: Mulchén, Región Bio Bío (Chile)
The works include the execution of the civil works and electromechanical assembly to extend the Mulchén Substation and the construction of Section 3, including the transition muffle yard from the overhead line of Section 1 (Tolchén Line), which will allow interconnection of the High Voltage Line and evacuation of the energy generated in the San Gabriel Wind Farm and the Tolpán Wind Farm.