Client: NORDEX
Location: Argentina
Construction of the electrical BOP, the medium voltage network, the 34/132 kV substation, and the 132 kV evacuation line for the Pomona wind farm in Rio Negro, Argentina.
Client: ENEL GREEN POWER
Location: Mexico
Construction of the civil BOP, roads, platforms, medium voltage network and foundations for the turbines of the Salitrillos wind farm in Reynosa, Tamaulipas.
Client: VESTAS EOLICA
Location: Argentina
Construction of the electrical BOP, the medium-voltage network, the new 33/132kV substation at the wind farm, the interconnection bay at Transba substation and the 132 kV evacuation line.
Client: ENEL GREEN POWER
Location: Chile (Chile)
Construction of the 99 MW Taltal wind farm in Chile and the 30/220 kV collector substation. The wind farm consists of 33 VESTAS V90 of 3 MW wind turbines.
Client: NORDEX
Location: Artigas (Uruguay)
We will be in charge of earthworks for roads, platforms, foundation excavations, WTG foundations, as well as the design, supply and turnkey construction of the 150 kV transformer substation. It will also execute the "T" connection to the 150 kV transmission line (between the substations Tomas Gomensoro and Artigas), as well as the communication and teleprotection in both stations and the collector system of the wind turbines of the Wind Farm integrated by 28 turbines N117 NCV of 2.4 MW and 50 Hz IEC3(a) for a total of 67.2 MW of installed power.
Client: EDP RENOVAVEIS, S.A.
Location: Rumanía (Romania)
Construction of the 72 MW Facaeni wind farm in Romania, including the 400/110/30 kV collector substation and the 400 kV underground line. The wind farm consists of 24 VESTAS V100 of 3 MW wind turbines.
Client: EDP RENOVAVEIS, S.A.
Location: Spain
Construction of the wind farm made up by 36 Gamesa 850 kW wind turbines 36 turbines G52 of 850 kW.
Client: EDP RENOVAVEIS, S.A.
Location: Spain
Construction of the wind farm made up by 50 Gamesa 850 kW wind turbines 50 turbines G52 of 850 kW.
Client: ACCIONA CESA
Location: Spain
Construction of the wind farm made up by 11 Gamesa 2 MW wind turbines 11 turbines G90 of 2 MW.
Client: EDP RENOVAVEIS, S.A.
Location: Spain
Construction of the wind farm made up by 13 Ecotecnia 1.67 MW wind turbines.
Client: VESTAS EOLICA
Location: Jordania (Jordan)
Construction of the 117 MW Al Tafila wind farm in Jordan and the 30/150 kV evacuation substation. The wind farm consists of 38 VESTAS V112 of 3 MW wind turbines.
Client: EDP RENOVAVEIS, S.A.
Location: Romania
Construction of wind farm consisting of 11 Vestas v115 wind turbines of 3 MW each.
Client: NORTHEOLIC SIERRA DE TINEO, S.L.
Location: Spain
Construction of a 44 MW wind farm made up by 22 Vestas 2 MW wind turbines. Supplier turbines: Vestas. Number, type and power: 22 turbines V 90 of 2 MW.
Client: IALOMITA POWER, SRL
Location: Romania
Underground line for the evacuation, from the Facaeni substation, of the wind farms in the area; including the laying, preparation of terminals, splices and tests until commissioning.
Client: EDP RENOVAVEIS, S.A.
Location: Romania
Underground, 13 km-long transmission line for two wind farms, with XLPE PE-OL-OT 64/110 kV 1x630 mm2 Al + 95 mm2 insulated cable, including laying, terminal manufacturing, joints and testing until commissioning.
Client: EUFER
Location: Spain
Overhead, 11.5 km-long transmission line for several wind farms with LA-180 double circuit + OF cable. Águila, Águila Real and Cóndor supports. Cable-laying in 8 km-long underground trenches with RHZ1 76/132 kV 400 mm2 Al + H 130 mm2 Cu insulated cable, including terminal manufacturing, cable assembly, support surge diverters and substation with construction of the underground-overhead connection.
Client: ENEL GREEN POWER
Location: Spain
Preventative maintenance and electrical correction of the high voltage facilities at the Begega wind farm.
Client: VESTAS EOLICA
Location: Jordania (Jordan)
The tasks included in the Tafila wind farm O&M service are as follows:
- On-call service available to respond quickly to any operational need and be at the facility before two (2) hours.
- Operation of the HV facilities when required by the property.
- Scheduled maintenance of the BOP scope (substations and underground lines).
- Predictive and preventive maintenance of BOP equipment.
- Unscheduled maintenance (corrective maintenance).
- Availability of experts to repair any damage.
- Remote supervision of the installations, consisting of 24/7 real-time monitoring to detect faults in the installation, by sending an e-mail to the service personnel's mobile terminal.
Client: EDP RENOVABLES ESPAÑA, S.L.U.
Location: Galicia (Spain)
Turnkey project for the management, execution and supervision of the activities related to the construction of the Muxía 30/66 kV substation, including the supply of switchgear, cubicles, control system and civil works, designed to evacuate the power of the Muxía I and Muxía II wind farms in La Coruña.
Client: EDP RENOVAVEIS, S.A.
Location: Romania
Design, construction and commissioning of the Facaeni 400/115/33 kV substation for the evacuation of wind farms in the area.
Client: PROMOCIONES ENERGETICAS DEL BIERZO
Location: Spain
"Turnkey" contract for the construction of the Villameca 400/132 kV substation in León for the transmission of 450 MW from the 16 wind farms in the area. The configuration of the substation was as follows:
Client: EUFER
Location: Spain
"Turnkey" construction of the San Gil 132/30 kV substation (Guadalajara) for the transmission from the 2 wind farms in the area, Loma Gorda and San Gil. The configuration of the substation is as follows:
Client: GENNEIA
Location: Argentina (Argentina)
Design, construction and commissioning of the 33/132 kV collector substation for the evacuation of three wind farms in Chubut totalling 168 MW.